On April 18, 2008, a Notice of Violation was issued for a Severity Level III violation involved the failure to file NRC Form 241– Report of Proposed Activities in Non-Agreement States, at least three days prior to engaging in licensed activities within NRC jurisdiction. Specifically, on numerous occasions during 2003, 2004, 2005 and 2007, Wang Engineering, Inc., a licensee of the State of Illinois, used portable moisture/density gauges containing licensed material at Department of Veteran Affairs (VA) construction sites; areas of exclusive federal jurisdiction in an Agreement State, without filing a Form-241 with the NRC.